Hoe Bridge School – Chapel Redevelopment
MEB Design were appointed by Hoe Bridge School for the chapel redevelopment project which is the second construction project of the school’s masterplan carried out in 2013. The project...

MEB Design were appointed by Hoe Bridge School for the chapel redevelopment project which is the second construction project of the school’s masterplan carried out in 2013. The project...
MEB Design Architects began working with Hoe Bridge School in the preparation of a Masterplan to consider the school’s  aspirations as a high performing Independent School and their requirements...
MEB Design were appointed as architects for the design of the new Theatre by the Lake, Keswick, Cumbria The theatre boasts a 400 seat capacity with studio theatre and...