
Hoe Bridge School – Dining Hall Extension
MEB Design were appointed by Hoe Bridge School for the Dining Hall Extension project following it being identified as a development project in the school’s masterplan prepared by MEB...
MEB Design were appointed by Hoe Bridge School for the Dining Hall Extension project following it being identified as a development project in the school’s masterplan prepared by MEB...
MEB Design were appointed by University of Oxford’s Wycliffe Hall in 2015 to undertake a strategic plan for the redevelopment works of their campus buildings. As a series of...
Christ Church Downend was constructed in 1836 and is a Grade II listed church. The refurbishment works included removal of pews and levelling of floors throughout with a new...