
Orpington Methodist Church
MEB Design were appointed by Orpington Methodist Church to design and develop upgrades to the church’s physical infrastructure. Specifically, the project included creating new front and rear entrances, expanding...
MEB Design were appointed by Orpington Methodist Church to design and develop upgrades to the church’s physical infrastructure. Specifically, the project included creating new front and rear entrances, expanding...
MEB were appointed by Sutton Valence School to design their new Visitor Reception and Administration Building as well as a significant hard and soft landscaping scheme. From feasibility to...
MEB Design were appointed to work with the Church Team to design a new church on the site of the existing 1960’s church which had became rundown and no longer...