
Tonbridge School – Theatre
The new theatre by MEB Design Architects at Tonbridge School was the last of 3 successive projects to be built and connects through from the Vere Hodge Centre. This...
The new theatre by MEB Design Architects at Tonbridge School was the last of 3 successive projects to be built and connects through from the Vere Hodge Centre. This...
MEB Design Architects worked in conjunction with CH Architects on the development of the new drama building at the centre of the school. The new building included a 277...
MEB Design Architects were appointed to develop a strategic plan to upgrade the site of the non-operating hospital and build new and replacement facilities. The work has taken place...