
Merland Rise Church, Tadworth
MEB Design were appointed to work with the Church Team to design a new church on the site of the existing 1960’s church which had became rundown and no longer...
MEB Design were appointed to work with the Church Team to design a new church on the site of the existing 1960’s church which had became rundown and no longer...
MEB Design have worked with Horley Baptist Church for over 10 years producing feasibly studies for existing and proposed sites. We have now completed phase one of a two...
This project involved the demolition of an existing dwelling, and to design a Code for Sustainable Homes (CSH) level 5 property. MEB Design were instructed for the design stage,...